AXY:MC-Basic:axis.ATTACHEDTO

From SoftMC-Wiki
Revision as of 15:37, 17 March 2014 by Lisa (talk | contribs)
Jump to: navigation, search

Returns the name of the task to which the axis is attached. If the axis is not attached to any program, an empty string is returned.

Syntax

?<axis>.AttachedTo

Availability

Versions 3.6.20 and higher

Type

String

Scope

Task, Terminal

Limitations

Read Only

Examples

?A1.AttachedTo

See Also