AXY:Element Coordination/ATP

From SoftMC-Wiki
Revision as of 13:20, 11 November 2012 by Miborich (talk | contribs)
Jump to: navigation, search
Element Coordination Verification Procedure


Test Requirements

AMCS Firmware version: 4.11.? Application Framework: ?


Related Documentation

Functionality ATP

Configuration Verification

Test Case №:
1
Date:


Performed by:


HW Rev:
FW Rev:

Test Purpose

X

Test Equipment
  • aico.control
  • MIB StandAlone or Extend
  • Simulated or Real system


Test Procedure
  1. Load configuration with more than 2 axes
  2. Set-up the axes properties (factors, limits, movement properties.)Set two axes startype to be different then SYNC
  3. Execute SyncAll commad
Expected Values
  • No movement


Measured Values
Test Results
Comments