Difference between revisions of "AXY:MC-Basic:axis.TIMEDECELERATION"

From SoftMC-Wiki
Jump to: navigation, search
m (Text replace - "''<axis>''" to "<''axis''>")
m (Text replace - "''<value>''" to "<''value''>")
Line 4: Line 4:
  
 
|SYNTAX=
 
|SYNTAX=
<''axis''>.TimeDeceleration = ''<value>''<br>
+
<''axis''>.TimeDeceleration = <''value''><br>
  
 
?<''element name''>.TimeDeceleration
 
?<''element name''>.TimeDeceleration

Revision as of 09:04, 17 March 2014

Defines the duration of the deceleration phase. This value is reached only if the other movement parameters cause it to occur. The maximum deceleration value is not exceeded.

A query of the property returns a numeric value, which may be used in expressions. This value is the assigned value - not the actual used value.

When –1 is assigned, this property is ignored and the defined deceleration is used instead.

A value that is not an integer multiple of the SERCOS cycle time is rounded up to the nearest integer multiple value.

Short form

<axis>.Tdec

Syntax

<axis>.TimeDeceleration = <value>

?<element name>.TimeDeceleration

Availability

All versions

Type

Double

Range

-1, 0 to MaxDouble

Units

Msec

Default

-1

Scope

Configuration, Task or Terminal

Limitations

To set the value within a task, the axis must be attached to that task (using the ATTACH command).

Examples

a1.TDec = 250 ‘sets the deceleration time to 250 msec

?a1.TimeDeceleration

See Also